Latest Reports

Electrical considerations with large AI compute
The training of large generative AI models is a special case…

Is this the data center metric for the 2030s?
When the PUE metric was first proposed and adopted at a Green…

Electrical considerations with large AI compute
The training of large generative AI models is a special case…

Is this the data center metric for the 2030s?
When the PUE metric was first proposed and adopted at a Green…
Other Reports

Mixed resiliency at the edge
Many analysts have forecast an explosion in demand for edge data centers. After a long, slow start, demand is beginning to build, with small, prefabricated and mostly remotely operated data centers ready to be deployed to support a varying array of applications.

Does the spread of direct liquid cooling make PUE less relevant?
The power usage effectiveness (PUE) metric is predominant thanks to its universal applicability and its simplicity: energy used by the entire data center, divided by energy used by the IT equipment.

New ASHRAE guidelines challenge efficiency drive
Earlier in 2021, ASHRAE’s Technical Committee 9.9 published an update — the fifth edition — of its Thermal Guidelines for Data Processing Environments.

Too big to fail? Facebook’s global outage
The bigger the outage, the greater the need for explanations and, most importantly, for taking steps to avoid a repeat.

Vertiv’s DCIM ambitions wither on Trellis’ demise
Operators often say that data center infrastructure management (DCIM) software is a necessary evil. Modern facilities need centralized, real-time management and analytics, but DCIM is notoriously difficult to deploy.

Startups brew new chemistries for fresh battery types
Widespread net-zero carbon emission pledges are spurring innovative data center battery technologies.

Eyeing an uptick in edge data center demand
Data center end-user organizations and suppliers alike expect an uptick in edge data center demand in the near term.

Fastly outage underscores slow creep of digital services risk
A recent outage at content delivery network Fastly took down…
UI @ 2021Green tariff renewable energy purchases
Until recently, power purchase agreements (PPAs) and unbundled…
UI @ 2021Pandemic has driven up data center costs
As the pandemic began to make an impact in early 2020, it became…

Renewable energy and data centers: Buyer, be aware
Across the world, data center owners and managers are striving…
UI @ 2021The insider threat: Social engineering is raising security risks
Uptime Institute Members say one of their most vexing security…
Content Categories
Subscribe to Journal via Email
Tags
Accredited Tier Designer (9)
AI (16)
artificial intelligence (11)
ATD (10)
Carbon Emissions (7)
Climate Change (13)
Cloud (22)
Cloud Computing (17)
Cloud Costs (15)
Cloud Infrastructure (29)
Cloud Migration (8)
cooling (8)
Data Center (243)
Data Center Availability (40)
Data Center Cooling (13)
Data Center Design (45)
Data Center Disaster Recovery (7)
Data Center Energy Efficiency (34)
Data Center Facilities Management (43)
Data Center Operations (66)
data center power (8)
Data Center Staffing (18)
DCIM (9)
digital Infrastructure (108)
energy (8)
Energy Efficiency (37)
Environmental Sustainability (18)
IT (7)
IT Efficiency (15)
IT Outages (10)
Kevin Heslin (6)
M&O (6)
outages (11)
Public Cloud (7)
PUE (9)
Regulations (23)
Resiliency (9)
security (7)
Sustainability (33)
Sustainability Reporting (7)
Tier Certification (26)
Tier Certification Constructed Facility (16)
Uptime Institute FORCSS (6)
Uptime Institute Network (13)
Uptime Institute Symposium (6)

